- Rockland, Maine, August, 2011 - The Maine-Eastern seasonal May thru October excursion train service based in Rockland, Maine, was recognized by New England Travel Magazine as the "Winner of Best of New England Travel 2011 - Attractions - Way To Beat Summer Traffic." The M-E also provides Christmas holiday shoppers specials in addition to operating a freight railroad operation. The views are scenic and are worth the ride on the train which uses vintage 'heritage' rolling stock. I've visited this operation and can say they run a great railroad. I'm hoping they'll be able to connect with Amtrak in Portland, Maine someday to give a commuter operation that is sorely needed. Congratulations to the The Maine-Eastern Railroad!
Welcome to The International Transportation Photojournalist and Syndicator of News Stories and Images Since 1993 - Joseph M. Calisi's Transportation Blog. All my materials on this blog are copyrighted.
Showing posts with label railroad. Show all posts
Showing posts with label railroad. Show all posts
Friday, August 26, 2011
Maine-Eastern Wins Travel Award
Tuesday, July 19, 2011
Connecticut Says: More M-8 Cars! The M-8s We Have Are Not Enough!!!
HARTFORD, CT, July 19, 2011 - Today, with 3 trainsets of M-8 cars operating 130 trips weekly, the State of Connecticut says that these cars are not enough. In addition to the 380 cars already ordered from the fully optioned first contract, an additional order is asking Kawasaki to build up to 25 additional cars with options for another 10-25 single cars if this additional contract is exercised by June 30, 2013. The cars will be used on the New Haven Line which services 120,000 riders a day between New Haven and New York City which is arguably called the busiest in the nation.
Connecticut’s share of the $93 million contract is $60.5 million (65%) with New York chipping in $32.6 million (35%). Governor Malloy will ask the State Bond Commission to put the state’s share on the agenda for the next meeting, scheduled for July 29.
Governor Dannel P. Malloy said, “I have made a commitment to our commuters to do everything we can to improve service, safety and reliability on the New Haven Line.” He added that, “This past winter underscored the ongoing problems with our aging train fleet, with frequent breakdowns and many cars out of service on any given day. Investing now in additional rail cars will pay off for years to come. And, we will entice more commuters to leave their cars behind and hop on the train.”
Metro-North President Howard Permut said, “Working with our partners at the Connecticut DOT, we have come up with a plan that allows for the full retirement of the problematic and obsolete design of the M-4 and M-6 fleet. This order will bring to 405 the number of new cars in service on the New Haven Line. This purchase, if approved by the board of the Metropolitan Transportation Authority, is a first for Metro-North. It will increase the efficiency of the fleet as a whole, offering maximum flexibility, while providing a modern, uniform electric fleet. While this car is good for the railroad’s ability to operate efficiently, it is our customers who will reap the benefits of bigger windows, more comfortable seats, electrical outlets at every seat, large bathrooms that work, destination signs inside and out, a crystal clear public address system and overall elegant design.”
There are a couple of differences between this new order and the previous one. These cars will cost about $3.325 million each and are ‘blind’ (not powered). There are no hostler controls or conductor communicators either which accounts for the lower cost. As single units, they will appear between M-8 pairs which is a ratio of one trailer to four powered cars.
The bottom line is that the current fleet of 'Cosmopolitan' M-2/4/6 cars will be history in 2014. It should be noted that 230 of the 337 Cosmo cars are more than 40 years old.
It would be nice if an M-2 (barcar pair), M-4 and an M-6 triplex could be saved for a transportation museum somewhere, after all, these were the cars that saved the New Haven line years ago.
Connecticut’s share of the $93 million contract is $60.5 million (65%) with New York chipping in $32.6 million (35%). Governor Malloy will ask the State Bond Commission to put the state’s share on the agenda for the next meeting, scheduled for July 29.
Governor Dannel P. Malloy said, “I have made a commitment to our commuters to do everything we can to improve service, safety and reliability on the New Haven Line.” He added that, “This past winter underscored the ongoing problems with our aging train fleet, with frequent breakdowns and many cars out of service on any given day. Investing now in additional rail cars will pay off for years to come. And, we will entice more commuters to leave their cars behind and hop on the train.”
Metro-North President Howard Permut said, “Working with our partners at the Connecticut DOT, we have come up with a plan that allows for the full retirement of the problematic and obsolete design of the M-4 and M-6 fleet. This order will bring to 405 the number of new cars in service on the New Haven Line. This purchase, if approved by the board of the Metropolitan Transportation Authority, is a first for Metro-North. It will increase the efficiency of the fleet as a whole, offering maximum flexibility, while providing a modern, uniform electric fleet. While this car is good for the railroad’s ability to operate efficiently, it is our customers who will reap the benefits of bigger windows, more comfortable seats, electrical outlets at every seat, large bathrooms that work, destination signs inside and out, a crystal clear public address system and overall elegant design.”
There are a couple of differences between this new order and the previous one. These cars will cost about $3.325 million each and are ‘blind’ (not powered). There are no hostler controls or conductor communicators either which accounts for the lower cost. As single units, they will appear between M-8 pairs which is a ratio of one trailer to four powered cars.
The bottom line is that the current fleet of 'Cosmopolitan' M-2/4/6 cars will be history in 2014. It should be noted that 230 of the 337 Cosmo cars are more than 40 years old.
It would be nice if an M-2 (barcar pair), M-4 and an M-6 triplex could be saved for a transportation museum somewhere, after all, these were the cars that saved the New Haven line years ago.
Thursday, June 30, 2011
Metro-North Adds More M-8 Runs With Newly Issued Timetable
New York, NY, June 27, 2011 - With the new timetables issued, no major schedule changes were apparent but something was different. Additional runs with the new M-8 cars seemed to be in effect.
Weekday rush hour train #1229 out of New Rochelle (at 8:15 a.m.) previously was sent to a trainyard upon arrival at GCT but this has changed as the trainset has been turned around for a return revenue trip up the New Haven line instead. Evidence of additional operation is purely visual on my part when I saw a southbound passing thru New Rochelle at about 12:20pm on Sunday, June 26th. More evening runs for the new 'tomato cans' have also been scheduled as a New Haven-bound M-8 has been scheduled during the 9 p.m. hour.
The photos in this post show the 2 newest emu models side by side in the grandest train terminal anywhere. The blue M-7 (to North White Plains) and red-faced M-8 (to New Haven) trains await the call to duty at Grand Central Terminal.
These new cars are a great ride so enjoy them when you have the chance. But remember one thing, don't spill your coffee or mar the interior. I'd like to see these new cars keep looking new for a while longer.
Weekday rush hour train #1229 out of New Rochelle (at 8:15 a.m.) previously was sent to a trainyard upon arrival at GCT but this has changed as the trainset has been turned around for a return revenue trip up the New Haven line instead. Evidence of additional operation is purely visual on my part when I saw a southbound passing thru New Rochelle at about 12:20pm on Sunday, June 26th. More evening runs for the new 'tomato cans' have also been scheduled as a New Haven-bound M-8 has been scheduled during the 9 p.m. hour.
The photos in this post show the 2 newest emu models side by side in the grandest train terminal anywhere. The blue M-7 (to North White Plains) and red-faced M-8 (to New Haven) trains await the call to duty at Grand Central Terminal.
These new cars are a great ride so enjoy them when you have the chance. But remember one thing, don't spill your coffee or mar the interior. I'd like to see these new cars keep looking new for a while longer.
Labels:
Calisi,
Commuter Rail,
GCT,
Grand Central,
Grand Central Terminal,
Kawasaki,
M-8,
Mass Transit,
Metro-North,
New York City,
Northeast Corridor,
Rail travel,
railroad,
Vergara
Sunday, April 3, 2011
Metro-North Issues New Spring Timetables
April 3, 2011 New Rochelle, NY - Metro-North has issued their new Spring timetable. I'll discuss the service changes over a period of time to show the overall scheduling changes.
As you may recall, riders 'lost' some trains due to budget and winter weather influences. For example, on the New Haven line, a 6:38 pm express out of GCT was combined with the 6:45 pm local as part of a service consolidation over the winter into a 6:42 pm departure. In the morning, the 8:29 am express to GCT briefly departed the scene forcing some to stand cheek-to-jowl into Grand Central on the 8:33 am local.
The one-month timetable (March 7 - April 2) shows the 8:31 am express, 6:38 pm express and 6:45 pm local returning to the scene, which made for less standing room usage and a more even distribution of passengers between the two trains.
Beginning today, those 3 trains are there, much to my relief - I hated standing all the way or if some large person is filling the middle seat forcing me to read his newspaper instead of mine. Some of those winter rides made me think I was on the Lexington Avenue subway all the way from NR; it wasn't very comfortable being that close to people with colds.
During March, we also saw the debut of the new M-8 commuer cars (yes, initially with that new car smell). For a period of 3 weeks, those new cars were scheduled on the 8:15 morning rush hour departure. For riders, this was a welcomed relief from the M-2/4/6 'Cosmopolitan' cars that began plying the rails about 30 yearas ago. As those cars saved the railroad back then, the M-8 cars will continue to offer great service. I just wish more bar car service would be introduced by keeping some M-2 trainsets because they make the trip home much more fun.
With the recent improvements on the New Haven line, better days and rides are ahead. Now with more space around me, there's nothing better than the tranquil rush hour ride on Metro-North because that's what I pay $204/month for.
As you may recall, riders 'lost' some trains due to budget and winter weather influences. For example, on the New Haven line, a 6:38 pm express out of GCT was combined with the 6:45 pm local as part of a service consolidation over the winter into a 6:42 pm departure. In the morning, the 8:29 am express to GCT briefly departed the scene forcing some to stand cheek-to-jowl into Grand Central on the 8:33 am local.
The one-month timetable (March 7 - April 2) shows the 8:31 am express, 6:38 pm express and 6:45 pm local returning to the scene, which made for less standing room usage and a more even distribution of passengers between the two trains.
Beginning today, those 3 trains are there, much to my relief - I hated standing all the way or if some large person is filling the middle seat forcing me to read his newspaper instead of mine. Some of those winter rides made me think I was on the Lexington Avenue subway all the way from NR; it wasn't very comfortable being that close to people with colds.
During March, we also saw the debut of the new M-8 commuer cars (yes, initially with that new car smell). For a period of 3 weeks, those new cars were scheduled on the 8:15 morning rush hour departure. For riders, this was a welcomed relief from the M-2/4/6 'Cosmopolitan' cars that began plying the rails about 30 yearas ago. As those cars saved the railroad back then, the M-8 cars will continue to offer great service. I just wish more bar car service would be introduced by keeping some M-2 trainsets because they make the trip home much more fun.
With the recent improvements on the New Haven line, better days and rides are ahead. Now with more space around me, there's nothing better than the tranquil rush hour ride on Metro-North because that's what I pay $204/month for.
Thursday, March 10, 2011
The Long-Awaited Metro-North M-8 Commuter Cars Are Unveiled...WOW!!!
New York, NY (March 1, 2011) – Since 2009, the Kawasaki-built M-8 emu (Electric Multiple Unit) trains have been hiding under a veil of secrecy and wonderment. With the 1970-era design ‘Cosmopolitan’ cars reaching the end of their useful lives, the public has been praying for the huge investment in new equipment be put into service. Today, those prayers were answered with the unveiling with the maiden voyage of the long-awaited modern rendition of commuter cars.
The M-8s have been beset by seemingly endless delays before entering into revenue service, first in production then during the testing/shake-down period. From a lack of correct steel to electromagnetic interference issues, the M-8 debut was pushed back time and time again. With the first 38 cars built in Kobe, Japan at Kawasaki’s plant, those cars needed to be transported to New York and delivered to their plant in Yonkers, NY before shipping to the New Haven shop for further testing before passing the 4,000-mile mark without any defects revealing themselves. When problems occurred, ‘the mileage clock’ was reset to zero and the process begun anew.
“These cars have successfully completed extensive, systematic tests. The many challenges that were revealed during intensive, real-world operations of the most complex rail car in North America on the continent’s busiest rail corridor, have been resolved,” said Metro-North President Howard Permut. “This testing took over one year to ensure that the M-8 will provide quality service for its 30 year life. We plan to put more of these cars into service as soon as they complete individual quality assurance testing.”
In all fairness, these M-8 cars were brought into revenue service 6 months sooner than their Bombardier-built M-7 model emu commuter cars. Those M-7s were heavily tested in Canada and at the test track in Colorado, away from critical eyes and comments. With the M-7 flaws not reported in the local media, it gave the impression that the M-7 was a flawlessly-built car. However, they endured the same critical benchmark testing as the M-8 with less scrutiny. Certainly the M-2/4/6 'Cosmopolitan' car outages snowstorm-caused by traction motor failures elevated the need for the new cars to come online.
As railroad equipment, the M-8 is the most advanced commuter car anywhere. The cars also have many features not immediately visible to the public such as critical solid-state computer controlled equipment within the carbody instead of under it in addition to the redundant air conditioning/heating systems on the roof. These improved designs will improve reliability and on-time performance. The power pickup system draws juice from either the third rail or overhead catenary – which allows the cars to operate anywhere along the Northeast Corridor. On-board investigative and monitoring capabilities are important tools that give road car inspectors and shop mechanics the ability to quickly diagnose problems and return them back on the road.
The project's engineering consultant, LTK, sub-contracted Cesar Vergara to develop a ‘world class’ transportation vehicle. The overall touches Mr. Vergara has made on these cars are astonishing and creates a completely modern look for the very utilitarian function of taking commuters to and from work. His work is exemplary and should stand as a model for future passenger rail cars. In addition to using Mr. Vergara’s extensive imagination and skills, intensive customer outreach which includes acquiring comments based on a mock-up, all went into the overall design of the cars – inside and out.
These new cars are beautiful and exciting to ride in. They give a smooth and comfortable ride with all the new 'hotel amenities' the riding public now demands. The bench seats are comfortable with individual headrests and an electrical outlet so electronic equipment such as computers can run on house current instead of rechargeable battery power. Recorded messages are clear and electronic signage leaves no doubt of the train you're on and what the next stop is. LED signs are clear and easy to read in and out of the car. The curved armrests seem to be one of the most notable improvements as the ones deployed on the M-7s seem to tear clothing when the rests find their way into pockets – a definite negative. There’s even an intercom passengers can use to contact the crew in an emergency.
Summary
These M-8s were custom-designed for Metro-North and they are gorgeous and a joy to ride in. This leap forward shows that the 1970s Cosmopolitan design while still functional, have seen their better days. Hail, hail - long live the ‘old tomato can’ Cosmo cars and make way for the ‘new tomato can’ the M-8s! They’re well worth the wait!
Editors: To publish the full-length version and photos, contact me at transprailien@gmail.com.
The M-8s have been beset by seemingly endless delays before entering into revenue service, first in production then during the testing/shake-down period. From a lack of correct steel to electromagnetic interference issues, the M-8 debut was pushed back time and time again. With the first 38 cars built in Kobe, Japan at Kawasaki’s plant, those cars needed to be transported to New York and delivered to their plant in Yonkers, NY before shipping to the New Haven shop for further testing before passing the 4,000-mile mark without any defects revealing themselves. When problems occurred, ‘the mileage clock’ was reset to zero and the process begun anew.
“These cars have successfully completed extensive, systematic tests. The many challenges that were revealed during intensive, real-world operations of the most complex rail car in North America on the continent’s busiest rail corridor, have been resolved,” said Metro-North President Howard Permut. “This testing took over one year to ensure that the M-8 will provide quality service for its 30 year life. We plan to put more of these cars into service as soon as they complete individual quality assurance testing.”
In all fairness, these M-8 cars were brought into revenue service 6 months sooner than their Bombardier-built M-7 model emu commuter cars. Those M-7s were heavily tested in Canada and at the test track in Colorado, away from critical eyes and comments. With the M-7 flaws not reported in the local media, it gave the impression that the M-7 was a flawlessly-built car. However, they endured the same critical benchmark testing as the M-8 with less scrutiny. Certainly the M-2/4/6 'Cosmopolitan' car outages snowstorm-caused by traction motor failures elevated the need for the new cars to come online.
As railroad equipment, the M-8 is the most advanced commuter car anywhere. The cars also have many features not immediately visible to the public such as critical solid-state computer controlled equipment within the carbody instead of under it in addition to the redundant air conditioning/heating systems on the roof. These improved designs will improve reliability and on-time performance. The power pickup system draws juice from either the third rail or overhead catenary – which allows the cars to operate anywhere along the Northeast Corridor. On-board investigative and monitoring capabilities are important tools that give road car inspectors and shop mechanics the ability to quickly diagnose problems and return them back on the road.
The project's engineering consultant, LTK, sub-contracted Cesar Vergara to develop a ‘world class’ transportation vehicle. The overall touches Mr. Vergara has made on these cars are astonishing and creates a completely modern look for the very utilitarian function of taking commuters to and from work. His work is exemplary and should stand as a model for future passenger rail cars. In addition to using Mr. Vergara’s extensive imagination and skills, intensive customer outreach which includes acquiring comments based on a mock-up, all went into the overall design of the cars – inside and out.
These new cars are beautiful and exciting to ride in. They give a smooth and comfortable ride with all the new 'hotel amenities' the riding public now demands. The bench seats are comfortable with individual headrests and an electrical outlet so electronic equipment such as computers can run on house current instead of rechargeable battery power. Recorded messages are clear and electronic signage leaves no doubt of the train you're on and what the next stop is. LED signs are clear and easy to read in and out of the car. The curved armrests seem to be one of the most notable improvements as the ones deployed on the M-7s seem to tear clothing when the rests find their way into pockets – a definite negative. There’s even an intercom passengers can use to contact the crew in an emergency.
Summary
These M-8s were custom-designed for Metro-North and they are gorgeous and a joy to ride in. This leap forward shows that the 1970s Cosmopolitan design while still functional, have seen their better days. Hail, hail - long live the ‘old tomato can’ Cosmo cars and make way for the ‘new tomato can’ the M-8s! They’re well worth the wait!
Editors: To publish the full-length version and photos, contact me at transprailien@gmail.com.
Labels:
Calisi,
commuter,
Commuter Rail,
GCT,
Grand Central Terminal,
Kawasaki,
M-8,
Manhattan,
Metro-North,
MTA,
New Haven line,
New Rochelle,
Rail travel,
railroad,
Vergara
Friday, February 11, 2011
Service is improving on Metro-North's New Haven line
Connecticut, February 11, 2011 - With the constant snowfalls seemingly abated, commuter car availability is improving on Metro-North's New Haven line. At the peak of the snowfall car failures, half of the New Haven fleet was out of service, with a majority of those cars being the 'Cosmopolitan' fleet of M-2/4/6.
The 'Cosmo' car concept came into existence when they were designed in the 1960s and built into the 80s. They saved the railroad at the time when the inherited New York Central and New Haven equipment that was ready for scrapping years before it actually happened. All this 'vintage' equipment constantly broke down at all times of the year, making the trip into Manhattan impossible to predict. Employers were beginning to consider (and some did) moving out of Manhattan and into suburbia for this very reason. With the arrival of the Cosmo cars, reliability and on-time performance improved and they saved the railroad. This is a subject many have failed to recognize and should be noted in the media - so let me be the first!!!!
While the M-2/4/6 cars saved the railroad, they had one flaw - snow. Fine particles gets into the traction motors, causing them to short out and become unuseable. Door issues suddenly because evident because the snow would inhibit proper proper door panel movement. All this is not new - it has been reported in the media before so these issues are not new and are also common knowledge. That said, Metro-North crews work diligently to make up for the deficiencies in these 'California cars' but somtimes Mother Nature has a way of defeating the best of intentions and preventative measures.
Several years ago, Connecticut (owner of the trackage in the Nutmeg State), began a process to correct these deficiencies and the resulting design gave birth to the M-8 cars built by Kawasaki. Originally supposed to come on line in 2009, production line problems occurred when the proper steel was not available and building stopped. When the process resumed, the delivery dates kept getting pushed back. This blog chronicled their 'debut' in December, 2010, only to find the M-8s could not pass their 4,000 mile error-free testing benchmark due to a reported software issue that fouled the wayside signalling system employed by operator Metro-North. The result - the 4,000-mile 'clock' had to be restarted.
http://newyork.cbslocal.com/2011/02/11/gov-malloy-stays-on-top-of-new-haven-line-problems/
that the first cut of M-8 cars could pass the 4,000-mile 'barrier' and we might begin to see the new equipment come on line soon but obviously not all at once. This is an obvious fact that all M-8s subsequent to the first 8, would be delivered as-completed to the New Haven maintenance shop from Nebraska where those cars are being manufactured. Railroad enthusiasts (a/k/a rail fans), have photographed the delivery of these cars piecemeal. This is good news as it confirms the production line is rolling.
These M-8 cars share a common thread with their Bombardier-built M-7 cars that operate on Long Island Rail Road and Metro-North's Harlem and Hudson lines - their design minimizes the damage snow can cause to the traction motors, making them more reliable.
When the M-8s come on line, I want to be the first to ride them as they represent the most modern and reliable design in commuter railroading. Will I miss the Cosmo fleet when they're gone? Absolutely because they saved the railroad 30 years ago and kept commuting alive while revitalizing the region economically. The next time you step onto a subway car or commuter coach of any type, consider the work the mechanics perform to keep them rolling. Falling prey to the pancea of saying new cars solves the problem is wrong because they still need to be maintained so they can keep rolling. This is one job that can't be outsourced overseas, thankfully.
Wednesday, December 29, 2010
New York Metro Area Swamped with 2-3 feet Of Snow. Mass Transit is stopped cold.
At about Noon this past Sunday, December 26th, the 6th-worst deluge of snow fell on the New York City Metropolitan area. In the area surrounding New Rochelle, NY 22 inches fell while Staten Island and parts of New Jersey received 29”. In time, autos and buses stopped rolling as the drifts reached 4-5 feet. Even rail transportation saw severe delays and even cancellations as the day wore on. New Rochelle and other municipal governments declared snow emergencies for the blizzard conditions at hand.
On Monday the 27th, Metro-North and Long Island Rail Road cancelled their commuter service. New Jersey Transit suspended bus service and cross-honored those tickets on commuter trains into New York Penn Station. Air traffic never took off as entire fight schedules were scuttled and terminals became temporary residences. In New Rochelle, Bee Line buses were nowhere to be found. The Post Office began ‘not guarantee-ing’ their next day mail service as those deliveries would be postponed somewhat. Shovel snow? It didn't feel good when the flakes came back to hit you in the face. In short, it became a day to stay home as that’s all you could do.
Tuesday the 28th proved better with some rail service into Manhattan with reduced schedules and cancelled trains ruling the day. In New York City, many streets were left unplowed in the surrounding boroughs and emergency equipment unable to reach their destinations.
With warmer temperatures melting some of the snow on Wednesday, the rail transportation picture improved and Bee Line buses resumed operation that I witnessed in New Rochelle. By Thursday, normal train schedule advisories were being sent out to the public by the commuter railroads.
Let’s hope the weekend rains don’t cause floods with the melting snow. If the floods happen, it might be a good time to use that new row boat I got on the 25th.
Note: Photos were taken in New Rochelle, NY 12/28/2010.
On Monday the 27th, Metro-North and Long Island Rail Road cancelled their commuter service. New Jersey Transit suspended bus service and cross-honored those tickets on commuter trains into New York Penn Station. Air traffic never took off as entire fight schedules were scuttled and terminals became temporary residences. In New Rochelle, Bee Line buses were nowhere to be found. The Post Office began ‘not guarantee-ing’ their next day mail service as those deliveries would be postponed somewhat. Shovel snow? It didn't feel good when the flakes came back to hit you in the face. In short, it became a day to stay home as that’s all you could do.
Tuesday the 28th proved better with some rail service into Manhattan with reduced schedules and cancelled trains ruling the day. In New York City, many streets were left unplowed in the surrounding boroughs and emergency equipment unable to reach their destinations.
With warmer temperatures melting some of the snow on Wednesday, the rail transportation picture improved and Bee Line buses resumed operation that I witnessed in New Rochelle. By Thursday, normal train schedule advisories were being sent out to the public by the commuter railroads.
Let’s hope the weekend rains don’t cause floods with the melting snow. If the floods happen, it might be a good time to use that new row boat I got on the 25th.
Note: Photos were taken in New Rochelle, NY 12/28/2010.
Wednesday, December 15, 2010
Metro-North’s New M-8 Commuter Car Debut Postponed About A Month
December 15, 2010 - According to a story published in the Connecticut Post, the spanking new New Haven line M-8 commuter cars are not coming on line this month as promised. Owing to a bug in the software, railway signal systems were disrupted while the cars were being tested. Kawasaki, that car's manufacturer, said the problem should be corrected soon.
I can't wait for these great-looking new cars to come on line into revenue service.
Click on the link for the whole story:
http://www.ctpost.com/news/article/Software-glitches-disrupt-signals-push-back-900772.php
I can't wait for these great-looking new cars to come on line into revenue service.
Click on the link for the whole story:
http://www.ctpost.com/news/article/Software-glitches-disrupt-signals-push-back-900772.php
Friday, December 3, 2010
Nat'l Railway Historical Society New York Chapter Celebrates Holiday Season
December 2, 2010, New York, NY - New York Chapter of the Nat'l Railway Historical Society celebrated the holiday season with a party and vintage videos of the railroads that called at Grand Central Terminal - the New Haven and the New York Central.
The group meets every month (except during the summer) in the Williamson Library of Grand Central on the first Thursday of the month.
Wishing eveyone a Merry Christmas, Happy Channukah (whatever your belief calls for).
The group meets every month (except during the summer) in the Williamson Library of Grand Central on the first Thursday of the month.
Wishing eveyone a Merry Christmas, Happy Channukah (whatever your belief calls for).
Saturday, October 16, 2010
Metro-North Conducts Annual Emergency Preparedness Drill
Grand Central Terminal, NY, October 16, 2010 – Metro-North Railroad conducted their 28th annual drill officially known as the ‘Emergency Preparedness Exercise’. NYPD, FDNY, Amtrak, NY State EMT and MTA PD participated in the Metro-North sponsored drill while Amtrak, TSA and other agencies observed the activity on track 15.
Metro-North President Howard Permut and MTA Chairman Walder spoke before the exercise began. The message delivered was that this time the focus would be on a railroad emergency instead of handling bomb threats as done in recent years. They added that the purpose of this real-life situation was to keep the skills of the first responders sharp.
The exercise began after every one reported to GCT’s track 15 and entered the Bombardier-built 85-foot commuter cab car and heard the instructions given to the participants, conductors and locomotive engineers being given their situational training. They were to follow the instructions on the activity cards given to them with no variation. After the observers left the car, it was show time.
In a real time accident scenario, a train would figuratively hit the bumper block and derail, and two serious and several other less-serious injuries would occur. The two ‘serious’ ones would be the engineer with severed limbs and a passenger would have whiplash. Both would be taken off the train in ‘spine stretchers’ and moved out of Grand Central on gurneys to waiting ambulances at an impromptu crisis command center on 42nd Street and fire trucks located on Vanderbilt Avenue.In reality, various federal, state and local first responder agencies would respond and have their own jurisdictional responsibilities, but for the most part groups such as the TSA were observers.
Monday, October 4, 2010
It’s Election Time – Meet The Candidates At The New Rochelle Train Station Again
October 4, 2010, New Rochelle, NY – It’s October and that means politicians will be out there campaigning. A favorite spot of theirs is the Manhattan-bound New Rochelle train station platform. This morning proved no different as Republican Bob Cohen was out there glad-handing and handing out flyers. Last week, Amy Paulin did the same with her entourage.
This location guarantees maximum exposure to a large cross-section of people and is a sure-fire way to talk to them and connect.
This tradition may end?
This ‘tradition’ of sorts could end when the MTA fully implements the tap-n-go technology. What has been leaked to the press in the past is that the commuter train platforms will no longer be a free and open access place for everyone because they’ll be ‘fare control areas’.
This new fare collection program will have a pole (or two) where the train rider will have to ‘tap’ their ‘fob’ card that comes with RFID (Radio Frequency ID) technology. Beyond this point, only fare-paying passengers will be allowed on the platform otherwise they could be subject to charges and fines.
Fear not, the tradition won’t end but evolve – just be ready to get your handshakes and flyers at the various street entrances instead.

Visit my other post on 'Talk Of The Sound', the popular New Rochelle website:
http://www.newrochelletalk.com/content/it%E2%80%99s-election-time-%E2%80%93-meet-candidates-new-rochelle-train-station-again
This location guarantees maximum exposure to a large cross-section of people and is a sure-fire way to talk to them and connect.
This tradition may end?
This ‘tradition’ of sorts could end when the MTA fully implements the tap-n-go technology. What has been leaked to the press in the past is that the commuter train platforms will no longer be a free and open access place for everyone because they’ll be ‘fare control areas’.
This new fare collection program will have a pole (or two) where the train rider will have to ‘tap’ their ‘fob’ card that comes with RFID (Radio Frequency ID) technology. Beyond this point, only fare-paying passengers will be allowed on the platform otherwise they could be subject to charges and fines.
Fear not, the tradition won’t end but evolve – just be ready to get your handshakes and flyers at the various street entrances instead.

Visit my other post on 'Talk Of The Sound', the popular New Rochelle website:
http://www.newrochelletalk.com/content/it%E2%80%99s-election-time-%E2%80%93-meet-candidates-new-rochelle-train-station-again
Wednesday, July 7, 2010
July 2010 New Rochelle, NY Transportation Center Update
By Joseph M. Calisi Copyright 2010 All Rights Reserved
Since the roof was blown off the pedestrian overpass over the tracks on February 12, 2009, some upgrades have been recently installed at the New Rochelle, NY train station.
From October, 2009 up until now, the roof of the overpass has been completely rebuilt and new safety features installed. A safety light system (inside the overpass) and a safety pole so workers can attach harnesses (atop the roof’s exterior) are two of the most visible features to the public.
I had a quick chat with a safety-vested worker as I advanced to the Manhattan-bound platform. I was told that slated for future work are canopy replacements and new train arrival boards similar to those installed on other New Haven line stations – all pending budget allowances within the next year to 18 months. Also on the list are overpass floor adjustments.
The station proper and its sheds belong to the City of New Rochelle and are not included in the plan.
At that point I mentioned to him that during the deluge of rain about a month ago, I saw water falling between the old station and Metro-North’s, rendering the newspapers in the green newspaper vending machines useless because they were water-logged. He said he’d take it up with the engineers for when the new canopy installation occurs.

Repairs to the New Rochelle train station are almost complete on July 7, 2010.

On February 12, 2009 at about 11:45 am, a 60+ mph wind-shear loosened the roof over the track walkway, knocking out 3 tracks until mid-afternoon when it was deemed that the catenary wire was not harmed. Passengers were only allowed to exit and board trains from the 4 eastern-most cars of the train.

Heavy rain comes into the New Rochelle Metro-North train station on May 3, 2010. The newspaper kiosk was soaked and damaged the newspapers inside.
Since the roof was blown off the pedestrian overpass over the tracks on February 12, 2009, some upgrades have been recently installed at the New Rochelle, NY train station.
From October, 2009 up until now, the roof of the overpass has been completely rebuilt and new safety features installed. A safety light system (inside the overpass) and a safety pole so workers can attach harnesses (atop the roof’s exterior) are two of the most visible features to the public.
I had a quick chat with a safety-vested worker as I advanced to the Manhattan-bound platform. I was told that slated for future work are canopy replacements and new train arrival boards similar to those installed on other New Haven line stations – all pending budget allowances within the next year to 18 months. Also on the list are overpass floor adjustments.
The station proper and its sheds belong to the City of New Rochelle and are not included in the plan.
At that point I mentioned to him that during the deluge of rain about a month ago, I saw water falling between the old station and Metro-North’s, rendering the newspapers in the green newspaper vending machines useless because they were water-logged. He said he’d take it up with the engineers for when the new canopy installation occurs.

Repairs to the New Rochelle train station are almost complete on July 7, 2010.

On February 12, 2009 at about 11:45 am, a 60+ mph wind-shear loosened the roof over the track walkway, knocking out 3 tracks until mid-afternoon when it was deemed that the catenary wire was not harmed. Passengers were only allowed to exit and board trains from the 4 eastern-most cars of the train.

Heavy rain comes into the New Rochelle Metro-North train station on May 3, 2010. The newspaper kiosk was soaked and damaged the newspapers inside.
Subscribe to:
Posts (Atom)



















